I have dates pulled from lookup fields from a list and set to new fields on a different list but thew dates are one day behind. I checked to see if they are indeed both just date and not date and time AND all else include regional settings are the same. Why are the dates coning in as one day behind for any date field between these two?
Dates from lookup fields that are set using a workflow carry over dates that are a day behind the source date. Why is that?