Skip to main content
Tag, typos, spelling
Source Link
moe
  • 5.3k
  • 21
  • 34

I have dates pulled from lookup fields from a list and set to new fields on a different list but thewthe dates are one day behind. I

I checked to see if they are indeed both just dateDate and not dateDate and Time, and time AND alleverything else includeincluding the regional settings, which are the same. Why

Why are the dates coningcoming in as one day behind for any date field between these two?

I have dates pulled from lookup fields from a list and set to new fields on a different list but thew dates are one day behind. I checked to see if they are indeed both just date and not date and time AND all else include regional settings are the same. Why are the dates coning in as one day behind for any date field between these two?

I have dates pulled from lookup fields from a list and set to new fields on a different list but the dates are one day behind.

I checked to see if they are indeed both just Date and not Date and Time, and everything else including the regional settings, which are the same.

Why are the dates coming in as one day behind for any date field between these two?

Source Link
Chuck Farley
  • 1.2k
  • 1
  • 14
  • 27

Dates from lookup fields that are set using a workflow carry over dates that are a day behind the source date. Why is that?

I have dates pulled from lookup fields from a list and set to new fields on a different list but thew dates are one day behind. I checked to see if they are indeed both just date and not date and time AND all else include regional settings are the same. Why are the dates coning in as one day behind for any date field between these two?