What all changes would be required to clone a SharePoint VM? Following is the scenario:
There is a production environment VM containing one WFE server and one database server. We want to clone this prod environment to create a QA environment. Both server resides in same network.
After cloning, what all steps needs to be performed so that QA environment does not point to the Production environment?
SharePoint version is 2010.