Questions tagged [gantt-view]

A type of list view that shows list information in the form of a Gantt chart, which is a type of bar chart that illustrates a project schedule.

Filter by
Sorted by
Tagged with
0 votes
2 answers
402 views

Is a vertical sticky row possible with a list built with rowFormatter?

I have built a roadmap view of projects, which follows the general design principles of building gantt charts with sharepoint lists and views (one example is Let's create a GANTT chart by Federico ...
Lunar Remedy's user avatar
0 votes
2 answers
6k views

Timeline / Gantt chart for Sharepoint Online

I want to create a timeline / gantt chart for tasks in Sharepoint Online. I am coming from working in a SP 2013 environment, where there was a standard Task list which had a gantt functionality. Does ...
Tally's user avatar
  • 2,273
0 votes
1 answer
47 views

"Slicing" a recurring task in a Gantt view?

Let's say I have recurring task in a Gantt view that happens every Monday. Let's call it a "preview". If I open this task in a Gantt view instead of calendar view it shows one huge bar all ...
FluffyChicken's user avatar
0 votes
0 answers
94 views

How do we get the selected item(s) id from SharePoint Task List Gantt View?

As shown in above figure. I have created a list using Task list template and also created a Gantt View of that. I want the selected items ID from that gantt view? How do we get the selected item ID ...
Y. Jagtap's user avatar
  • 323
0 votes
1 answer
315 views

Gantt Chart View disappearing when leaving page and coming back

I created a new Gantt view in my list and after adding it, it loaded fine. When I leave and go back to the original All Items list and try to come back to the Gantt view, it just shows the list view. ...
Michelle's user avatar
0 votes
3 answers
2k views

Why does Gantt not work in Modern?

I have made a list in SharePoint Online. The list has a few views, among them a Gantt view. It works perfect when create it. I can see Gantt view fine. However when I switch views the Gantt stops ...
Cherubel's user avatar
  • 563
0 votes
2 answers
1k views

Create a Gantt chart that only shows Main tasks

I'm currently using the following piece of code to hide all the subtasks from my view. <script src="https://code.jquery.com/jquery-3.2.1.min.js" integrity="sha256-...
cod3r_jim's user avatar
  • 307
2 votes
0 answers
163 views

Gantt presentation in SP 2013

Has anyone come across a render or CSS that can be applied to the OOTB SP 2013 Gantt charts? In my view, the whole left-hand construct of the chart looks really very tacky. I don't need this section ...
southskies's user avatar
2 votes
2 answers
526 views

Gantt Chart showing small size

I have created a page layout with 5 tab and each tab has a webpart zone than I added webpart on each tab. However some time gantt chart showing small size and some time with proper size. I have got ...
Ramesh's user avatar
  • 574
3 votes
1 answer
361 views

Gantt view in task list is empty

I created a gannt view to my task list. I set title, start date and due date. However when i open this view I can see that right panel is empty. How can I repair it?
Daniel's user avatar
  • 351
3 votes
1 answer
333 views

SharePoint 2013: Re-sort or Hide Grouping Row in Gantt View

I have a user who is using a SharePoint list with a gantt view as MS Project-lite. For each Project, there are 4 entries in the list: Project, Phase 1, Phase 2, Phase 3. Each entry has a reference to ...
Kalea's user avatar
  • 550
1 vote
0 answers
850 views

SharePoint 2013: Collapsing subtasks by default in a Gantt Chart

I was wondering if I could create a script that would modify the current Gantt Chart view so that all of the subtasks would be collapsed. I got the idea from this post which does this on a list: https:...
iamthehxc's user avatar
1 vote
1 answer
287 views

Custom gantt view showing documents and applicable project phase

I am trying to create a custom gantt view to show a list of project documents and which project phases they span across (similar to the below image). Instead of inputting start and end dates I would ...
linesd's user avatar
  • 23
1 vote
2 answers
2k views

Sharepoint-Online Caculated End Date shows as blank on Gantt View

I have noticed a number of issues with DataSheet/Gantt View when using calculated columns, i will list others at the bottom, however my main concern here is my gantt chart not showing an end date for ...
Paul's user avatar
  • 111
3 votes
1 answer
3k views

Combine three task list into one

I have three task list on three subsites of my main sharepoint (sharepoint online). What I would like to do is "overlay" like you can with the calendar, but instead the list in list form so it can be ...
Loren Denton's user avatar
0 votes
0 answers
1k views

Executing JavaScript after a gantt chart has finished loading

I have a gantt chart and I want to scroll to today's date. I've found the code online but I've not found a way to delay the execution of the code until after the chart is rendered. I've currently ...
Richard Banks's user avatar
0 votes
1 answer
130 views

Create Gantt View for External Lists Sharepoint 2010

I created External List in SharePoint 2010. I want to create a Gantt View for this external list now. How to do it?
user28455's user avatar
  • 203
1 vote
2 answers
2k views

How To: Every Document Set Has Its Own Tasks List

I have a document library with document sets in it. Each document set represents a project. On the welcome page of each document set I want to show a tasks list (in Gantt chart view) that will be ...
Submits's user avatar
  • 3,264
0 votes
2 answers
4k views

Gantt Chart Scale - Zoom out to Quarter

Is there a way I can make the Gantt chart scale to display in monthly/quarterly by zooming out default?
George's user avatar
  • 1,522
1 vote
1 answer
2k views

How to have a timeline/gantt overview on my homepage

How am I able to have a gantt chart on my home page of my SharePoint? It just keeps giving me a list of the different launches I'm looking over. I'm needing it as an overview timeline to control ...
stacy's user avatar
  • 11
1 vote
0 answers
82 views

Actions on tasks displayed on the gantt view

I want to know if it is possible to drag and drop tasks in the gantt view or resize.
dev04's user avatar
  • 11
0 votes
1 answer
12k views

To add an item to a document library, use SPFileCollection.Add()

I have created a Gantt view for document library. Everything configured correctly. But when user add item using inline editing user gets error "To add an item to a document library, use ...
Sivakumar Piratheeban's user avatar
1 vote
1 answer
1k views

Can I achieve conditional formatting on a gantt chart?

I have created a Gantt view on a list, showing the Gantt chart and several columns. One of my list columns is a R/Y/G status column. I would like the cell that displays the R/Y/G status to show the ...
theMayer's user avatar
  • 209
1 vote
0 answers
321 views

Gantt View Group by on 2 columns

I have simple calendar events which contain 2 user fields which have a start and end time spanning many calendar days. the fields are user 1 and user 2. based on this, is it possible to display a ...
Dan's user avatar
  • 11
2 votes
3 answers
7k views

Custom list quick edit missing one or more required column

I am trying to create a custom list that is editable in quick view, only three columns are required (Project Name, Project Start Date, Project Estimated End Date)and I am trying to display it in a ...
therealkeys's user avatar
1 vote
0 answers
499 views

Change the colour from Gantt digram via JavaScript

I'm quite new here an I would like to know how I could change the colour from the bar in the gantt daigramm via JavaScript von "green" to "blue", but I need a specific blue. How can I do that? I ...
user24555's user avatar
1 vote
0 answers
478 views

Gantt Chart Web Part: '[Column]' already belongs to this DataTable

I ran into an issue in vanilla Sharepoint 2010 where I had a gantt chart set up on a page and another user modified it, forcing me to recreate the chart. I went to connect the new chart to data ...
Sirah's user avatar
  • 11
0 votes
1 answer
22k views

gantt chart scale [duplicate]

Is there a way to change the gantt chart scale? to something other than days I would like to use it to monitor active contracts but I need a year based not just days (or it gets to big to see)
Crash893's user avatar
  • 581
2 votes
1 answer
554 views

sharepoint 2010 shared gantt chart - out of the box functionality

we're looking to share a task list with an associated gantt chart view across multiple sites within the same site collection. We have tried saving the web part and included data within share point ...
Simon's user avatar
  • 121
2 votes
1 answer
981 views

Information on displaying a gantt chart in SharePoint 2010

I am looking to create a release management Gantt chart in a SharePoint 2010 dashboard. I am wondering if anyone on here has done this in the past and has any tips and tricks. I am looking for a ...
Sydney Gayle's user avatar
0 votes
1 answer
391 views

Specify Lookup list for the 'Title' Column of a Gantt chart view

I was hoping to use a lookup list as the title column for a Gantt chart view. The problem is when I go to the Gantt columns in the settings for the view it doesn't display any of the lookup list ...
Dkong's user avatar
  • 405
2 votes
5 answers
16k views

How to Force Alphabetical Order in Lookup Dropdown with Multiple Choices

In my portal (Sharepoint Server 2010 Enterprise) I have a simple list with only the title field. I've created about 50 entries in the list. In another list, I have a lookup column that pulls from ...
bgmCoder's user avatar
  • 3,581
3 votes
1 answer
466 views

XSLT - add icon in GANTT view

In my custom XSLT file, I am able to modify a choice field to swap the text for icons. My choice looks like this; it just checks for the column header name and for the number in parenthesis, then ...
bgmCoder's user avatar
  • 3,581
1 vote
1 answer
6k views

Set the column width in GANTT view

When the GANTT view is being used, how could one resize the columns using jQuery without using the generated controlid (like in this example)? I'm looking for a way to do this in a re-usable ...
bgmCoder's user avatar
  • 3,581
0 votes
0 answers
250 views

Saving site as a template breaks Gantt view of list

I am in the process of creating a project management system, in which there is a Gantt chart of all the tasks, displayed as a view of a particular list. I am attempting to save the site as a template ...
Henry C's user avatar
  • 153
2 votes
0 answers
555 views

Dynamically Setting a List View on a WebPart Page

I have been unable to load a page showing a dynamicaly selected View. I can not just display the List itself (Although this would allow me to specify the View in the URL) because I need to modify ...
Hank's user avatar
  • 51
2 votes
0 answers
542 views

SharePoint 2010 InfoPath Library Gantt Chart View MISSING Zoom In/Zoom Out Feature

How do I get the Zoom In/Zoom Out function back into the Library tab as it is in the List tab for Gantt Chart Views? Why would is the Zoom function missing from the Library tab? I set up a Gantt ...
ZBowen's user avatar
  • 21
4 votes
0 answers
368 views

Gantt View and Javascript Events [closed]

I'm displaying a Gantt view in a page in like this: <Module Name="DefaultBlank" Url="" Path=""> <File Path="EmployeeWorkspacePages\default.aspx" Url="default.aspx" > <...
Ronen's user avatar
  • 119
2 votes
1 answer
1k views

How to hide the left pane in JS grid gantt chart in sharepoint

I am trying to create a custom gant chart control in sharepoint by using JS Grid control. I am following this tutorial: How to: Create a Gantt Chart Using the JS Grid Control 1) How can I hide left ...
Imir Hoxha's user avatar
  • 1,905
1 vote
1 answer
2k views

Gantt view on default page

I'm trying to put gantt view of the list on the default page of the site. For common views, i'm using module with the default.aspx page and view i need this way: <?xml version="1.0" encoding="utf-...
Dmitry's user avatar
  • 13
2 votes
1 answer
760 views

customize or extend sharepoint gantt chart to dipslay data from multiple lists

I would like to display data from different lists in a gantt chart view. I have different lists like: Stages, categories, parts. So data from stages List (stage1, stage2, stage3,...) will be ...
Imir Hoxha's user avatar
  • 1,905
3 votes
1 answer
3k views

Gantt Chart in SharePoint-- Timeline view disappears

The first time I load the page, the timeline view of tasks appears no problem. However, when I start to add an item, scroll along the timeline, or otherwise take an action on the page, the timeline ...
user1397044's user avatar
1 vote
1 answer
536 views

Gant view for vacation

I want to create a Gant-view showing the vacations for all users. And I have done that but not in the way I want it. Now each user is able to create events for the vacation say 2 events 1.6 - 20.6 and ...
Roland Bengtsson's user avatar
4 votes
2 answers
8k views

Can the zoom/scale on JS Grid conrol in gantt mode be changed?

I have created a webpart with a JS Grid control with gantt enabled. I want the gantt view to display months instead of weekdays. Anyone have an idea how to do this? Update: The following link is what ...
stiangodo's user avatar
  • 390
0 votes
2 answers
4k views

List Error "user does not exist or is not unique"

I have a large list that I'm having a heck of a time moving from one sharepoint cluster to another. The error I'm getting is when I load the content into the list (via cut and paste), I get an error ...
Ryan's user avatar
  • 59
1 vote
2 answers
6k views

Gantt Chart - Project Task - Can Not Edit Item (Row)

I have created a Project Task List (aka the one with the Gantt Chart) and we are having a problem because no one can edit anything. I have reviewed all the permissions and I can't find anything wrong. ...
Ryan's user avatar
  • 59
1 vote
0 answers
981 views

How do I ensure that the task list displays in Gantt view when creating a new site from template?

I have a site with a Task List, which has a custom Gantt view as the default view. The home page of the site, which is not a wiki page, has a List View Web Part for the Task List where the Gantt view ...
Geir Smestad's user avatar
  • 1,680