3

I have a 365 tenant where I need to have a workflow triggered on a custom date field set by the user, to do a review before the doc validity expires.

I've done the workflow in both 2010 and 2013 versions to test...

Workflows in SPD

When I add a retention stage and go to 'Start a workflow', only the 2010 workflow is an option:

Retention options... but where's the 2013 flow?

I've checked if it's the same for library and content-type based retention (it is) and when using a different date field (it is). Both of the workflows run OK if started manually (it just checks the fields are OK then sends an email).

I saw this on one of our 2013 O/P installs as well but never raised it with MS - it feels like retention wasn't properly interfaced with the 2013 onwards workflow engine.

Anyone?

1
  • I realised just after posting this it may be the workflow type, but having a Reusable rather than a List also made no difference. Aug 23, 2016 at 14:43

1 Answer 1

4

Got in touch with MS about this - as I thought, the 2013 workflows aren't exposed to the IMP interface because of the different engine type. You use 2010 workflows or nothing.

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service and acknowledge that you have read and understand our privacy policy and code of conduct.