I have a Sharepoint 2013 List called L1 (Vacation Request).
I created a SharePoint Designer 2013 Workflow on change of L1 and the workflow creates a Task and assigns it to a user (Approver)
Now on Approval or Rejection of the Task, I need to update the Status (Approved/Rejected) in L1.
How can I achieve this?
How do I find the linkage between Task and List item?