I have a date field Date of join
and other field Date on induction
(date type). Based on some selection I want to calculate If Date of join
is 20/05/2015 then Date on induction
should be auto selected as Date of join
+ 7 days, like result should be 27/05/2015.
Can you please let me know how I can acheive with SharePoint Designer Workflow